Your cart is currently empty!
AC biomodules for infiltration & soil bed
Package includes
- AC biomodule package 14m2
- Additional package soil bed to biomodule package
- Sampling well 110mm
- Groundwater pipes
Price pickup Västerås, see shipping price at checkout
The package is unique as it includes inspection pipes on the spreader pipe and the new requirement for groundwater pipes.
A new requirement is that the property owner or supervisory authority must be able to check that the infiltration or ground bed is not in the groundwater, for which the facility needs to have a so-called groundwater pipe included in the package.
Inspection pipe with cap on the spreader pipe makes it possible to flush the spreader pipe in case of sludge escape from the sludge separator and inspect the function.
This package is used if the soil is so dense (LTAR less than 15) or if the groundwater level is so high that the protective distance of 1 meter between the spreader pipe and the highest groundwater level cannot be achieved.
AC Biomodules are made up of a carrier material that has been used and tested in various types of treatment plants for many years and is used by several suppliers.
A natural biofilm is formed on the tubular carrier material that breaks down the pollutants and nitrogen in the wastewater.
The design of the bio modules means that the bacterial culture living in the bio skin gets optimal oxygenation, and the risk of clogging is then much smaller.
No distribution well is needed when using only one spreader line.
Advantages AC Biomodules
- The purification function is optimized by a very good oxygenation in the patented modules.
- The pollutants in the wastewater are broken down by the biofilm formed in the tubular modules.
- The wastewater is distributed and spread over a much larger area than in an ordinary plant if you
use spreader plates. - The surface area of the bed is reduced by 40% compared to traditional infiltration.
Dimensioning for Vertical soil bed without spreader plate
|
BDT |
|
|
|
Number of households |
Bed surface |
Number of packages |
|
1 |
14 m2 |
1 pc |
|
2 |
28 m2 |
2 pcs |
|
3-4 |
42 m2 |
3 pcs |
The design of the bed can be changed, as long as the surface is similar.
Each string is 2 meters wide for Vertical soil bed, maximum length of a string at self-fall is 15 meters otherwise pumping is required.
Dimensioning for horizontal soil bed without spreader plate
|
BDT |
|
|
|
Number of households |
Bed surface |
Number of packages |
|
1 |
21 m2 |
1 pc |
|
2 |
42 m2 |
2 pcs |
|
3-4 |
63 m2 |
3 pcs |
The design of the bed can be changed, as long as the surface is similar.
Each string is 3 meters wide for horizontal soil bed, maximum length of a string at self-fall is 15 meters otherwise pumping is required.
The size of the package is 120x110x170, weight about 100kg
If you buy the “Additional spreader plate for AC biomodule package” you get these benefits.
- The water is spread over a much larger area using spreader plates.
- Reduces the bed surface further by about 11%
- Gravel as spreader layer is deleted.
Dimensioning for vertical soil bed with spreader plate
|
BDT |
|
|
|
Number of households |
Bed surface |
Number of packages |
|
1 |
11 m2 |
1 pc |
|
2 |
22 m2 |
2 pcs |
|
3-4 |
33 m2 |
3 pcs |
The design of the bed can be changed, as long as the surface is similar.
Each string is 2 meters wide for Vertical soil bed, maximum length of a string at self-fall is 15 meters otherwise pumping is required.
Dimensioning for horizontal soil bed with spreader plate
|
BDT |
|
|
|
Number of households |
Bed surface |
Number of packages |
|
1 |
16,5 m2 |
1 pc |
|
2 |
33 m2 |
2 pcs |
|
3-4 |
49,5 m2 |
3 pcs |
The design of the bed can be changed, as long as the surface is similar.
Each string is 3 meters wide for horizontal soil bed, maximum length of a string at self-fall is 15 meters otherwise pumping is required.
The following materials may need to be procured separately, depending on the type of bed and facility to be constructed and local conditions.
- Sand 0.2-8 mm (Soil bed or reinforced/elevated infiltration).
- Gravel spreading layer 100 mm, 8-16 or 16-32 mm, not needed for packages with spreader plate
- Gravel/shingle for drainage layer, e.g. 8-16 mm (for soil bed).
- Sealed rubber sheet and grommets for sealed soil bed.
- Ground insulation boards to protect pipes and infiltration from freezing.
- Water pipes and hoses to the distribution networks.
- Pump well if there is no gravity flow in the system, placed before the infiltration or after at the soil bed.
- Alarm to pump well or sludge separator.
- Sludge filter or sludge filter well to secure against sludge escape to the bed.
- Odor filters to remove odors instead of the ventilation hoods.
- Extra phosphorus removal with chemical precipitation to meet high environmental standards.
Infiltration or Soil Bed, what should I choose?
The choice between infiltration or soil bed depends mainly on the permeability of the soil (LTAR) and the distance that can be obtained from the bed spreader pipe down to groundwater or rock. If the level is below
the protective distance of 1 meter, an elevated infiltration with extra soil bed sand is added to reach
1 meter protective distance.
Soil analysis with percolation test to obtain the important LTAR value
Different types of soil are suitable for infiltration. If the soil consists of fine soils,
the soil may be too dense to infiltrate, for example clay. If the soil consists of very coarse soils, it is advisable to have reinforced infiltration so that the water does not pass through the soil too quickly.
With a percolation test, you can easily determine the permeability of the soil yourself.
Simple Infiltration, LTAR 15-50
This variant can be used if a percolation test gives an LTAR value between 15 and 50 and if the distance between the bed
spreader pipes is at least 1 meter.
Elevated infiltration, high groundwater or rock, LTAR 15-50
If the highest level of the groundwater is so high that the protective distance of 1 meter between the bed spreader pipe and groundwater or rock cannot be obtained, an elevated infiltration with extra soil bed sand is added to reach the protective distance of 1 meter.
Enhanced infiltration, LTAR greater than 50
If the permeability of the soil is too high, if a percolation test gives a LTAR value higher than 50, the water will flow through too quickly. You then choose to make a reinforced infiltration with soil bed sand of 400mm.
Soil bed, LTAR less than 15
A soil bed is used if the soil consists of such dense masses (LTAR < 15) that it cannot absorb the water it is loaded with or if
the groundwater level is so high that the protective distance of 1 meter between the spreader pipe and the maximum
AC biomodules for infiltration & soil bed
Package includes
- AC biomodule package 14m2
- Additional package soil bed to biomodule package
- Sampling well 110mm
- Groundwater pipes
Price pickup Västerås, see shipping price at checkout
The package is unique as it includes inspection pipes on the spreader pipe and the new requirement for groundwater pipes.
A new requirement is that the property owner or supervisory authority must be able to check that the infiltration or ground bed is not in the groundwater, for which the facility needs to have a so-called groundwater pipe included in the package.
Inspection pipe with cap on the spreader pipe makes it possible to flush the spreader pipe in case of sludge escape from the sludge separator and inspect the function.
This package is used if the soil is so dense (LTAR less than 15) or if the groundwater level is so high that the protective distance of 1 meter between the spreader pipe and the highest groundwater level cannot be achieved.
AC Biomodules are made up of a carrier material that has been used and tested in various types of treatment plants for many years and is used by several suppliers.
A natural biofilm is formed on the tubular carrier material that breaks down the pollutants and nitrogen in the wastewater.
The design of the bio modules means that the bacterial culture living in the bio skin gets optimal oxygenation, and the risk of clogging is then much smaller.
No distribution well is needed when using only one spreader line.
Advantages AC Biomodules
- The purification function is optimized by a very good oxygenation in the patented modules.
- The pollutants in the wastewater are broken down by the biofilm formed in the tubular modules.
- The wastewater is distributed and spread over a much larger area than in an ordinary plant if you
use spreader plates. - The surface area of the bed is reduced by 40% compared to traditional infiltration.
Dimensioning for Vertical soil bed without spreader plate
|
BDT |
|
|
|
Number of households |
Bed surface |
Number of packages |
|
1 |
14 m2 |
1 pc |
|
2 |
28 m2 |
2 pcs |
|
3-4 |
42 m2 |
3 pcs |
The design of the bed can be changed, as long as the surface is similar.
Each string is 2 meters wide for Vertical soil bed, maximum length of a string at self-fall is 15 meters otherwise pumping is required.
Dimensioning for horizontal soil bed without spreader plate
|
BDT |
|
|
|
Number of households |
Bed surface |
Number of packages |
|
1 |
21 m2 |
1 pc |
|
2 |
42 m2 |
2 pcs |
|
3-4 |
63 m2 |
3 pcs |
The design of the bed can be changed, as long as the surface is similar.
Each string is 3 meters wide for horizontal soil bed, maximum length of a string at self-fall is 15 meters otherwise pumping is required.
The size of the package is 120x110x170, weight about 100kg
If you buy the “Additional spreader plate for AC biomodule package” you get these benefits.
- The water is spread over a much larger area using spreader plates.
- Reduces the bed surface further by about 11%
- Gravel as spreader layer is deleted.
Dimensioning for vertical soil bed with spreader plate
|
BDT |
|
|
|
Number of households |
Bed surface |
Number of packages |
|
1 |
11 m2 |
1 pc |
|
2 |
22 m2 |
2 pcs |
|
3-4 |
33 m2 |
3 pcs |
The design of the bed can be changed, as long as the surface is similar.
Each string is 2 meters wide for Vertical soil bed, maximum length of a string at self-fall is 15 meters otherwise pumping is required.
Dimensioning for horizontal soil bed with spreader plate
|
BDT |
|
|
|
Number of households |
Bed surface |
Number of packages |
|
1 |
16,5 m2 |
1 pc |
|
2 |
33 m2 |
2 pcs |
|
3-4 |
49,5 m2 |
3 pcs |
The design of the bed can be changed, as long as the surface is similar.
Each string is 3 meters wide for horizontal soil bed, maximum length of a string at self-fall is 15 meters otherwise pumping is required.
The following materials may need to be procured separately, depending on the type of bed and facility to be constructed and local conditions.
- Sand 0.2-8 mm (Soil bed or reinforced/elevated infiltration).
- Gravel spreading layer 100 mm, 8-16 or 16-32 mm, not needed for packages with spreader plate
- Gravel/shingle for drainage layer, e.g. 8-16 mm (for soil bed).
- Sealed rubber sheet and grommets for sealed soil bed.
- Ground insulation boards to protect pipes and infiltration from freezing.
- Water pipes and hoses to the distribution networks.
- Pump well if there is no gravity flow in the system, placed before the infiltration or after at the soil bed.
- Alarm to pump well or sludge separator.
- Sludge filter or sludge filter well to secure against sludge escape to the bed.
- Odor filters to remove odors instead of the ventilation hoods.
- Extra phosphorus removal with chemical precipitation to meet high environmental standards.
Infiltration or Soil Bed, what should I choose?
The choice between infiltration or soil bed depends mainly on the permeability of the soil (LTAR) and the distance that can be obtained from the bed spreader pipe down to groundwater or rock. If the level is below
the protective distance of 1 meter, an elevated infiltration with extra soil bed sand is added to reach
1 meter protective distance.
Soil analysis with percolation test to obtain the important LTAR value
Different types of soil are suitable for infiltration. If the soil consists of fine soils,
the soil may be too dense to infiltrate, for example clay. If the soil consists of very coarse soils, it is advisable to have reinforced infiltration so that the water does not pass through the soil too quickly.
With a percolation test, you can easily determine the permeability of the soil yourself.
Simple Infiltration, LTAR 15-50
This variant can be used if a percolation test gives an LTAR value between 15 and 50 and if the distance between the bed
spreader pipes is at least 1 meter.
Elevated infiltration, high groundwater or rock, LTAR 15-50
If the highest level of the groundwater is so high that the protective distance of 1 meter between the bed spreader pipe and groundwater or rock cannot be obtained, an elevated infiltration with extra soil bed sand is added to reach the protective distance of 1 meter.
Enhanced infiltration, LTAR greater than 50
If the permeability of the soil is too high, if a percolation test gives a LTAR value higher than 50, the water will flow through too quickly. You then choose to make a reinforced infiltration with soil bed sand of 400mm.
Soil bed, LTAR less than 15
A soil bed is used if the soil consists of such dense masses (LTAR < 15) that it cannot absorb the water it is loaded with or if
the groundwater level is so high that the protective distance of 1 meter between the spreader pipe and the maximum


